MEPCO New Connection 2024

MEPCO New Connection 2024

Are you Looking for a MEPCO New Connection? Let us guide you on how to get that. You can also visit the nearest office and get the application form, or you can also apply online.

You will see an easy form where you can choose type of the electricity bill new connection status, and in the Distribution of Company list, make sure to choose MEPCO. Fill in all of the other fields, upload and scan copies of the related documents and then apply for a new connection.

How To Apply For MEPCO New Connection?

Here are the steps How To Apply For MEPCO New Connection:

  1. Fill online application form from here.
  2. Upload the scanned copies of following documents:
  3.  (a) Proof of the ownership.
  4.  (b) Undertaking by applicant.
  5.  (c) Power of the attorney in the case of and more than the one owner.
  6.  (d) No Objection in Certificate (NOC) in case applicant will be tenant.
  7.  (e) Attested the copy of the applicant’s CNIC.
  8.  (f) Attested the copies of the CNIC of two or witnesses (not required in the case of the single phase connection)
  9.  (g) A copy of the concerned tariff duly a signed by consumer.
  10. Submit application form.
  11. Get the printed copy of application form.
  12. Attach the copy of required documents with application form.
  13. Send application along with all of attachments to concerned office.
  14. You will be receive the demand notice after the verification of the documents.
  15. Now you have to be pay demand notice to designated bank.
  16. Submit the copy of the paid demand notice to concerned office.
  17. The meter of connection will installed after the payment of verification of the demand notice.

If you will have to applied for the new connection, and you want to check the application status, you will have to visit nearest office of mepco new connection demand notice print MEPCO bill or call helpline. If you want to be check the MEPCO Bill Multan new connection, you will have to check it from here.

Estimated Time Required for MEPCO New Connection:

How long will they take to have a new meter connection? It is depends on the connection or category. Basically there are the 3 main categories of the MEPCO electric supply connection according to the load.

Category Number 2 (16, 70 kW / 400 volts)

Process to get the new category Number 2 of Mepco new connection is almost the same as the category one, but it can be take up to 44 days or more to complete category number 2 connection.

Category Number 3 (71, 500 kW / 400 volts)

Just like category one and the two, there are the same steps of category number 3, even soo category it may be take up to the 73 days from the application submission of date to the meter installation.

Conclusion

In conclusion, obtaining a new connection with MEPCO is straightforward. Whether applying online or visiting their office, follow the steps to submit your application and required documents. Be sure to check your application status through their helpline or by visiting their office. MEPCO’s process ensures your new meter installation promptly, tailored to your connection category.

Rate this post